100MW PV Combined Power Station Project Were Successfully Completed
100MW PV combined power station project were successfully completed.
Project Type:
General mountain PV power station + mining subsidence area
Project Capacity:
4,382,279MWh
Average Annual Power Generation:
175,291MWh
Floor Area:
5,061 mu
Product Type:
Double-sided half-chip module + fixed bracket
Technical Highlights:
1. PV power station is built in the coal mining subsidence area
2. The fully prefabricated cabin solution is adopted for the step-up substation
3. An intelligent O&M and fault diagnosis system is adopted to improve O&M efficiency.
4. The support is made of high-strength steel, and the amount of steel used for the support in the whole project is reduced by 468t.
5. Cable is purchased in batches, and the use process is carefully managed to avoid waste.
Project Highlights:
1. The template construction is firstly adopted to unify construction standards, improve the construction quality, and avoid common quality problems.
2. The electrical processes for the foundation construction of box-type transformer, cable laying, and electrical wiring are strictly controlled, and the construction quality is excellent.
3. All risks of the project are controlled in advance, and the project progress meets the requirements.
Previous
Next
Contact Info
Cherish whatsApp :+8613001157493 email:cherish@wingosolar.com.cn
Address:
Room 718-719,Tower Office,Investment Innovation Center, No. 2809.Innovation Avenue,High-tech Zone, Hefei City, Anhui Province,China
Quick Link